Scope and delivery
- Experience group
- Principal consultant experience
- Role and context
- Principal consultant technical contribution.
- Contribution or assignment status
- Completed technical contribution
- Sector
- Not stated
- Scope
- ERT, GIS and geologic correlation for EGGAR preparation.
- Delivery category
- Geotechnical correlation and borehole-verification inputs.
- Professional limitation
- Screening does not replace a site-specific design investigation or professional design review.